Parliament Bill No. 427
In committeeAn Act Establishing the Amanah Chain (a-Chain) System – a Blockchain-Based Platform for Transparent, Accountable, and Trustworthy Public Financial Governance in the Bangsamoro Autonomous Region in Muslim Mindanao, and for Other Purposes
Establishes the Amanah Chain (a-chain) System - Blockchain-based Public Financial Governance Platform.
Filed
First Reading
Second Reading — CommitteeNow
Second Reading — Plenary
Third Reading
Approved
Enacted
Under committee study or floor debate. Amendments are still possible, and this is the stage where public input carries the most weight.
What this measure does
The Amanah Chain Act of 2025, or A-CHAIN Act. It makes a blockchain ledger, the Amanah Chain, the official public record of the region's budget allocations, releases, procurement, project milestones and disbursements, with a public Transparency Portal for non-confidential entries.
Every ministry, office and agency, province, city, municipality and barangay must connect its budget, allotment, disbursement, procurement, project and audit records to the system and name A-CHAIN compliance officers. Failing to upload required records is an administrative offence. Records are verified by "validator nodes" such as the Bangsamoro Treasury Office, COA-BARMM, universities and civil society groups. "Smart Amanah Contracts" would trigger fund releases or procurement steps automatically once requirements are met.
MFBM leads, BICTO builds and runs the system, and COA-BARMM uses it for audits. It starts as a pilot in 1 infrastructure ministry, 1 social service ministry, 1 province and 1 city or municipality. The rules are due within 90 days.
It was filed on 9 January 2026 by MP Jaafar Apollo Mikhail L. Matalam, read on first reading on 19 January 2026 and referred to the Committee on Ways and Means on 21 April 2026. It remains in committee.
Why it was proposed
The explanatory note says the scale of public spending in the region needs records that are verifiable, traceable and resistant to manipulation, and ties this to Amanah, the trust placed in officials to manage public resources. It says a blockchain ledger would track every peso from appropriation to audit, record procurement and contract milestones, keep disbursement trails, and open non-confidential records to the public in real time.
The note says the measure is not a copy of any national proposal, though it was inspired by the national demand to confront corruption.
Who it affects
- Every regional ministry, office and agency, and every province, city, municipality and barangay, which must upload records.
- Officials who fail to upload, who would face administrative liability.
- Citizens, researchers and civil society, who would get a public portal.
Who would implement it
- Ministry of Finance, and Budget and Management
- Bangsamoro Information and Communications Technology Office
- Commission on Audit, BARMM office
Funding
Carries an appropriation. No amount is stated in the copy filed. Section 10 names the Bangsamoro Appropriations Act, the block grant, the Special Development Fund and other lawful sources.
What changes if it becomes law
- Nothing yet. The bill is in committee.
- If enacted, a pilot ledger would start in 2 ministries, 1 province and 1 town.
- All regional and local offices would eventually have to put their budget and procurement records on it, with penalties for not uploading.
Raised during deliberations
No published record of the debate on this measure. Parliament’s journals cover sittings up to March 2023 only, and no committee report on it has been published.
What to notice
The copy filed has a missing section. Section 7 lists only MFBM's duties; the next items are numbered 8.1 to 8.4 under no Section 8 heading, covering BICTO, the Commission on Audit, all ministries and LGUs, and the public portal. Section 9 follows.
The bill assigns duties to the Commission on Audit, a constitutional body that a regional law does not direct, and names COA-BARMM as a validator node. It also makes upload mandatory for every barangay while setting no timetable beyond a pilot in 4 units, and puts no figure on what building and running the system would cost.
It was referred to the Committee on Ways and Means, which handles revenue, rather than the finance committee that handles spending, 3 months after first reading. The short title says 2025, though the bill was filed on 9 January 2026.
How to take part
Submit a position paper via the Parliament's Call for Position Papers page, or attend/watch the responsible committee's public hearings.
Sources