Bangsamoro Autonomy Act No. 79

In force

An Act Establishing a Level I General Hospital in the Municipality of Maluso, Province of Basilan, and Appropriating Funds Therefor

A hospital is established under the regional health ministry, which funds construction and initial running. Management transfers to the Provincial Government of Basilan when the province asks and the ministry agrees, or a five-yearly assessment finds it capable — with a joint transition plan, a one-year timetable, and parliamentary monitoring.

  1. Filed

    Oct 10, 2022

  2. First Reading

    Jan 25, 2023

  3. Second Reading — Committee

    Jun 24, 2024

  4. Second Reading — Plenary

    Jul 22, 2025

  5. Third Reading

    Aug 20, 2025

  6. Approved

    Aug 20, 2025

  7. EnactedNow

    Aug 20, 2025

Signed into law and operative unless later amended or repealed.

What this measure does

A twenty-five bed Level I general hospital is established at Maluso in Basilan, with fifty million pesos behind it, under the administrative supervision and operational control of the regional health ministry — which also has to fund the building, the infrastructure, the equipment and the initial running costs.

Sections 5 and 6 are the substance, and they are word for word the scheme used in the Tipo-Tipo act passed the same day. Management transfers to the Provincial Government of Basilan on whichever comes first: a formal provincial request that the health ministry concurs in, or a favorable ministry assessment carried out every 5 years. A joint transition plan then phases the turnover of responsibilities, personnel, assets and systems within 1 year, and goes to Parliament's Committee on Health for monitoring.

And after the handover the region does not walk away. Section 6 — headed 'Continuity Provision' here, where its twin called it a sunset — keeps the ministry providing technical support and, where the province cannot manage, financial support: personnel salaries, essential medical supplies, equipment maintenance. That support is reported to Parliament annually, for as long as it lasts.

Why it was proposed

To build a hospital in Maluso, and to settle in advance the question of who runs it in the long term.

Who it affects

  • Residents of Maluso and the surrounding parts of Basilan.
  • The Provincial Government of Basilan, the intended eventual manager.
  • Hospital staff, whose turnover is expressly part of the transition plan.
  • Parliament's Committee on Health, which monitors the plan and the continuing support.

Who would implement it

  • Ministry of Health – BARMM, with administrative supervision and operational control, funding construction, conducting the five-yearly assessments and issuing the transfer order
  • Provincial Government of Basilan, which may request transfer and co-develops the transition plan
  • Basilan Integrated Provincial Health Office, which co-prepares the annual development plan
  • Bangsamoro Parliament, through the Committee on Health and the Committee on Finance, Budget and Management

Funding

Carries an appropriation. ₱50,000,000 initial from the 2025 General Appropriations Act of the Bangsamoro. The Ministry is separately obliged to ensure funding for construction, infrastructure, equipment and initial maintenance and personnel costs pending transfer — and to provide financial support afterwards where the province cannot.

What changes if it becomes law

  • Maluso gains a 25-bed Level I hospital, built and initially run by the region.
  • Devolution is put on a tested trigger rather than a date.
  • The handover has a one-year outer limit and a written plan covering personnel and systems.
  • Parliament monitors both the transition and the continuing support.
  • Regional support tapers rather than stopping at the handover.

Raised during deliberations

No published record of the debate on this measure. Parliament’s journals cover sittings up to March 2023 only, and no committee report on it has been published.

What to notice

The interesting thing about this act is that it is not original. It is the Tipo-Tipo scheme applied a second time, on the same day, to a second municipality in the same province — which answers a question the earlier reading had to leave open.

The recurring frustration across the region's health legislation is that good provisions appear once and vanish. BAA 73 wrote a three-year delivery deadline and an annual report to Parliament; BAA 80, 3 months later, had neither. BAA 76 required publicly accessible annual reports; no other hospital act does. The pattern suggested that whoever drafted a particular bill well, drafted it well alone.

Here the careful version was reused. The two Basilan hospitals carry an identical devolution architecture — dual trigger, formal transfer order, joint transition plan capped at a year, parliamentary monitoring, and continuing technical and financial support reported annually. That is a template rather than a one-off, and it is the strongest version of devolution drafting the registry contains.

One small difference is worth recording because it is the only one: BAA 78 heads Section 6 a 'Sunset Provision' and this act heads the same text a 'Continuity Provision'. The words point in opposite directions — one at support ending, the other at support persisting — over a clause that does both. Nothing turns on it legally, but it is a fair emblem of what the section is trying to balance.

Read from Bangsamoro Autonomy Act No. 79, enacted text as signed · read August 2026. This section is our reading of those documents, not Parliament’s words.

Get involved

Public records get betterwhen people check them.

Spotted an error, or have a document worth adding? Every correction and every source makes the record stronger — and the official source is always right where we are wrong.